Afghanistan's Electric Power, Present and Planned
At present only 16,000 kw of power, including diesel, is available in Afghanistan, but plans are made for the development of hydro-electricity, some of which are already nearing completion. Here is the description of all these plans, completed and under construction :
Chak-i-Wardak Power Station : This is located on the Wardak river about 57 miles south of Kabul. This 16-year-old plant has three Siemens turbo-generators, each of 1,400 kw, and each generating 1,100 kw. The maximum generation of 3,300 kw is all for Kabul. From the dam to the power house there is a canal from two-and-a-half to three miles, which leads into a two-metre steel flume with a 25 metre drop. Round steel pole transmission line support is used, with three-wire transmission at 44,000 volts. If the water supply is sufficient, the plant operates 24 hours a day; during low water periods it operates from 6.00 p.m. to 11.00 p.m. There are no plans for its expansion.
Jabalus Seraj Power Station : This plant, located on the Salung River about 45 miles north of Kabul, has two General Electric generators of 500 and 600 kw, both installed 45 years ago when the plant was built. It also has two Siemens generators of 960 kva, one three and the other eight years old. Maximum generation is 1,900 kw, with average at 1,600 kw. Only two machines are used, since there is never sufficient water for more. Of the kw generated, 1,300 to 1,500 goes to Kabul, 200 kw goes to Jabal Seraj and Charikar, and 200 to 400 kw goes to nearby textile plant. Water from the dam, which is located one mile up-river from station, flows through a canal to enter a one-and-a-half metre flume just above the
Roughly two thirds of characters agree with a modern printed edition of the same text. Much of the disagreement is editorial, not misreading. Treat the transcription as a finding aid and read the page image before quoting. How this was measured.